Scheduled Service Change: Migrate Goldwin-Smith node router - L3

Event:
2024-09-10 04:00:00
Expected Duration:
2024-09-10 07:00:00
Status:
Closed
Brief Description:
On September 10th, 2024, between approximately 4am and 7am, CIT Network Engineering will be performing work on the Goldwin-Smith node router to migrate to new hardware.
User Impact:
During the physical firewall move and the FW/L3 config migration (approximately 20minutes), wired network access will be disrupted. Wireless network access will not be impacted.

During the physical wireless controller move, wireless network access will be disrupted. (approximately 20 minutes).
Services Affected:
Network
Subsites Affected:
Wi-Fi
Wired Network
Full Description:
On September 10th, 2024, between approximately 4am and 7am, CIT Network Engineering will be migrating buildings on the Goldwin-Smith node router to new hardware. This is part of a project to upgrade network capacity and allow for growth across the campus network. During this window, buildings connected to the Goldwin-Smith's node will experience sporadic interrupted network access.

Buildings that are connected to the Goldwin-Smith Node router include:

  • 2008:Lincoln Hall
  • 5310:Hydro Electric Plant
  • 2004:Sibley Hall
  • 2007:Tjaden Hall
  • 2086:Johnson Art
  • 2002:White Hall
  • 2003:McGraw Hall
  • 2013A:GoldWin-Klarman Hall
  • 2010:Uris Lib
  • 2047:Olin Lib
  • 2047a:Kroch Lib
  • 2011:Stimson Hall
  • 2026:Day Hall
  • 2005:Sage Chapel
  • 3802:Milstein Hall
  • 2001:Morrill Hall
  • 2017:Rand Hall
  • 2015:Foundry
CIT TDX ID:
1511479



Timeline of Changes

Description Current Status Date Time
On September 10th, 2024, between approximately 4am and 7am, CIT Network Engineering will be migrating buildings on the Goldwin-Smith node router to new hardware. This is part of a project to upgrade network capacity and allow for growth across the campus network. During this window, buildings connected to the Goldwin-Smith's node will experience sporadic interrupted network access.

Buildings that are connected to the Goldwin-Smith Node router include:

  • 2008:Lincoln Hall
  • 5310:Hydro Electric Plant
  • 2004:Sibley Hall
  • 2007:Tjaden Hall
  • 2086:Johnson Art
  • 2002:White Hall
  • 2003:McGraw Hall
  • 2013A:GoldWin-Klarman Hall
  • 2010:Uris Lib
  • 2047:Olin Lib
  • 2047a:Kroch Lib
  • 2011:Stimson Hall
  • 2026:Day Hall
  • 2005:Sage Chapel
  • 3802:Milstein Hall
  • 2001:Morrill Hall
  • 2017:Rand Hall
  • 2015:Foundry
2024-09-03 10:10:35