Scheduled Service Change: Migrate Hollister node router - L3
Event:
2024-08-07 04:00:00
Expected Duration:
2024-08-07 07:00:00
Status:
Closed
Brief Description:
On August 7, 2024, between approximately 4am and 7am, CIT Network Engineering will be performing work on the Hollister node router to migrate to new hardware.
User Impact:
During the physical firewall move and the FW/L3 config migration (approximately 20 minutes), wired network access will be disrupted. Wireless network access will not be impacted. During the physical wireless controller move, wireless network access will be disrupted. (approximately 20 minutes).
Services Affected:
Network
Subsites Affected:
Wired Network
Full Description:
On August 7, 2024, between approximately 4am and 7am, CIT Network Engineering will be migrating the Hollister node router to new hardware. This is part of a project to upgrade network capacity and allow for growth across the campus network. During this window, buildings connected to the Hollister node will experience sporadic interrupted network access.
Buildings that are connected to the Hollister Node router include:
2009:Barnes Hall
2016:Schwartz (Theater Arts)
2020:Willard
2021:Myron Taylor
2024:Olin Hall
2038:Anabell Taylor
2039:Bard Kimble Thurston
2042:Carpenter Hall
2046:Hollister
2049:Snee Hall
2704:Cornell Health (Formerly Gannett)
3001:Cascadilla Hall
3002:Sage Hall
3028:Hughes Hall
3090:Sheldon Court
4716:107 Edgemoor
4719:13 South Ave
4722:6 South Ave
4724:14 South Ave
4748:312 Edgemoor
4753:Telluride
4759:104 West Ave
Buildings that are connected to the Hollister Node router include:
2009:Barnes Hall
2016:Schwartz (Theater Arts)
2020:Willard
2021:Myron Taylor
2024:Olin Hall
2038:Anabell Taylor
2039:Bard Kimble Thurston
2042:Carpenter Hall
2046:Hollister
2049:Snee Hall
2704:Cornell Health (Formerly Gannett)
3001:Cascadilla Hall
3002:Sage Hall
3028:Hughes Hall
3090:Sheldon Court
4716:107 Edgemoor
4719:13 South Ave
4722:6 South Ave
4724:14 South Ave
4748:312 Edgemoor
4753:Telluride
4759:104 West Ave
CIT TDX ID:
1479158
Timeline of Changes
Description | Current Status | Date | Time |
---|---|---|---|
On August 7, 2024, between approximately 4am and 7am, CIT Network Engineering will be migrating the Hollister node router to new hardware. This is part of a project to upgrade network capacity and allow for growth across the campus network. During this window, buildings connected to the Hollister node will experience sporadic interrupted network access. Buildings that are connected to the Hollister Node router include: 2009:Barnes Hall 2016:Schwartz (Theater Arts) 2020:Willard 2021:Myron Taylor 2024:Olin Hall 2038:Anabell Taylor 2039:Bard Kimble Thurston 2042:Carpenter Hall 2046:Hollister 2049:Snee Hall 2704:Cornell Health (Formerly Gannett) 3001:Cascadilla Hall 3002:Sage Hall 3028:Hughes Hall 3090:Sheldon Court 4716:107 Edgemoor 4719:13 South Ave 4722:6 South Ave 4724:14 South Ave 4748:312 Edgemoor 4753:Telluride 4759:104 West Ave |
2024-08-01 | 10:49:09 |