Skip to main content

Scheduled Service Change: Migrate Rhodes node router to new core routers

Event:
2024-03-26 04:00:00
Expected Duration:
2024-03-26 05:00:00
Status:
Closed
Brief Description:
On Tuesday, March 26, 2024, between approximately 4am and 5am, CIT Network Engineering will be migrating uplinks for the Rhodes node router. This is part of a project to upgrade network capacity. Connectivity may be disrupted briefly.
User Impact:
Connectivity may be disrupted briefly during the maintenance window for the buildings served by the Rhodes Node router.
Services Affected:
Network
Subsites Affected:
Wired Network
Full Description:
On Tuesday, March 26, 2024, between approximately 4am and 5am, CIT Network Engineering will be migrating uplinks for the Rhodes node router. This is part of a project to upgrade network capacity and allow for growth within the core tier of the campus network. By migrating one core uplink at a time we can minimize impact but connectivity may be disrupted briefly.

The CAC research environment is within the scope of this work, but the managed server farm environment is not.

Buildings served by the Rhodes Node router:
2000:Duffield Hall
2039:Phillips Hall
2043:Grumman Hall
2044:Gates Hall
2045:Upson Hall
2051:Rhodes Hall
2061:Ward Lab
2701:Sage House
2703:Schuyler House
3914:Breazzano Ctr for Business
3927:301 College Ave
3928:409 College Ave
3933:Seneca Place
3934:312 College Ave
4414:Trolley Bridge
4403:Dwyer Bridge & Dam
CIT TDX ID:
1334784



Timeline of Changes

Description Current Status Date Time
On Tuesday, March 26, 2024, between approximately 4am and 5am, CIT Network Engineering will be migrating uplinks for the Rhodes node router. This is part of a project to upgrade network capacity and allow for growth within the core tier of the campus network. By migrating one core uplink at a time we can minimize impact but connectivity may be disrupted briefly. The CAC research environment is within the scope of this work, but the managed server farm environment is not. Buildings served by the Rhodes Node router: 2000:Duffield Hall 2039:Phillips Hall 2043:Grumman Hall 2044:Gates Hall 2045:Upson Hall 2051:Rhodes Hall 2061:Ward Lab 2701:Sage House 2703:Schuyler House 3914:Breazzano Ctr for Business 3927:301 College Ave 3928:409 College Ave 3933:Seneca Place 3934:312 College Ave 4414:Trolley Bridge 4403:Dwyer Bridge & Dam 2024-03-21 10:49:03