Scheduled Service Change: Upgrade F5 BigIP cluster firmware
Event:
2022-09-29 09:00:00
Expected Duration:
2022-09-29 11:00:00
Status:
Closed
Brief Description:
The server farm F5 bigip load balancer firmware will be upgraded. Application owners are advised to check their systems after the upgrade as connectivity may be intermittent at times through out the process and some connections may drop.
User Impact:
Applications may experience a brief network interruption (a few seconds) while the standby device takes over during maintenance.
Services Affected:
Network
Subsites Affected:
Data Center
Managed Servers
Full Description:
The server farm F5 bigip load balancer firmware will be upgraded. Application owners are advised to check their systems after the upgrade as connectivity may be intermittent at times through out the process and some connections may drop.
CIT TDX ID:
803118
Timeline of Changes
Description | Current Status | Date | Time |
---|---|---|---|
The server farm F5 bigip load balancer firmware will be upgraded. Application owners are advised to check their systems after the upgrade as connectivity may be intermittent at times through out the process and some connections may drop. | 2022-09-26 | 13:44:59 |