Scheduled Service Change: Fiber optic cable relocation feeding Humphrey's Service Building
Event:
2017-02-12 11:00:00
Expected Duration:
2017-02-12 21:00:00
Status:
Closed
Brief Description:
The relocation of the 2 fiber cables feeding Humphrey's Service Building is a continuation of the "Lynah Rink Roof Project" work.
User Impact:
Some network connectivity (wired and wireless) will be unavailable at buildings indicated sometime during this maintenance period.
Services Affected:
Network
Full Description:
Some network connectivity (wired and wireless) will be unavailable due to this maintenance. Several network switches, Weinhold1-3500 (Bldg code: 5101 - Chill Water Plant 1 Weinhold Facility), HEF1-2500 and IHSHEF1-2500 (5112-Chill Water Plant 4 LSC HEF Facility) will lose connectivity sometime during this maintenance period as fiber connections are relocated.
CIT TDX ID:
Timeline of Changes
Description | Current Status | Date | Time |
---|---|---|---|
Some network connectivity (wired and wireless) will be unavailable due to this maintenance. Several network switches, Weinhold1-3500 (Bldg code: 5101 - Chill Water Plant 1 Weinhold Facility), HEF1-2500 and IHSHEF1-2500 (5112-Chill Water Plant 4 LSC HEF Facility) will lose connectivity sometime during this maintenance period as fiber connections are relocated. | 2017-02-10 | 22:04:49 | |
Some network connectivity (wired and wireless) will be unavailable due to this maintenance. Several network switches, Weinhold1-3500 (Bldg code: 5101 - Chill Water Plant 1 Weinhold Facility), HEF1-2500 ( ) and IHSHEF1-2500 ( ) will lose connectivity sometime during this maintenance period as fiber connections are relocated. | 2017-02-10 | 18:59:11 | |
. | 2017-02-09 | 21:12:25 |